Drainage

How can we help?

Drainage we do on a Weekly Basis

  • Replacing leaky water mains

  • Sewer and stormwater (drainage) graded/percentage shots

  • De-watering – slotted uPVC pressure pipe

We can either Trench or Drill for you

  • Project scope and initiation – to help us better understand what you want

  • Corridor Access Requests (CAR) – Auckland Transport/Council approvals to work on their land, i.e. between private boundaries

  • B4UDIG requests – existing service obstruction plans and on-site mark outs

  • Excavate to expose existing services and create entry and exit holes to enable drilling

  • Resource consent preparation, approval and on-site approved Arborists

  • New Zealand Transport Agreement (NZTA) Service Agreements (SA)

  • Traffic management plans – prepare/create site specific traffic and pedestrian management plans

  • Traffic management execution – all types and levels

  • Directional drilling of both PE pipes and PVC ducts – 20mm up to 560mm – Power, Water , Gas, Telecom, Sewer & Stormwater

  • Blow ribbon (draw wire) for hauling purposes and end cap for internal protection

  • Final reinstatement – hard (concrete, hotmix and pavers) and soft (topsoil) surfaces

How can we help?

Speak to one of our friendly adventure consultants who would love to help you out.